You are here: Case Studies » Huge savings with FloorTight

Huge savings with FloorTight


Client: DON-BUR
Industry: Trailer manufacturer

“Before we started using Huck vehicle returns with split floor panels meant either installing additional fixings or replacing the entire trailer floor which at £160 per panel is a costly exercise. The solution developed by our Huck distributor has a number of benefits.  Due to their high tensile strength fewer fasteners are required and can be set at intervals of 150mm instead of 100mm. Completed joints are also moisture resistant, thus protecting the wood element in the floor. Carried out by one operator instead of two, the simple installation process eliminates secondary tightening of bolts and possible thread snarling. In fact, the time saved is enabling us to produce six vehicles per week instead of five and in the six months since trialling this system no vehicles have been returned for repairs.”

Andrew Richardson
Engineering Director

 
Key Benefits
  • Fewer fasteners required
  • Joins are moisture resistant
  • Installation by only one operator
  • Eliminates re-torque
  • Improved users productivity

Contact us

Solution needed call 0800 019 81800800 019 8180
Solution needed call 0800 182 69280800 182 6928
Solution needed call 0800 901 3520800 901 352
Solution needed call 0800 182 6928+61 3 8545 3333
Solution needed call 0800 182 6928+61 3 8545 3333
To discuss your requirements. If you are outside the countries shown above please call 00 44 1952 290011